General

Salt Water Disposal Facility Takes PPI Honor for Piping Systems Division

This post was originally published on this site To process the extremely hot and corrosive saltwater from oil and gas drilling operations, the Gondor Saltwater Disposal (SWD) facility, in McKenzie County, North Dakota, used a network of high-density polyethylene (HDPE) pipe that required almost 700 couplings even though the system had fewer than 1,800 feet

Salt Water Disposal Facility Takes PPI Honor for Piping Systems Division Read More »

Salt Water Disposal Facility Takes PPI Honor for Piping Systems Division

This post was originally published on this site To process the extremely hot and corrosive saltwater from oil and gas drilling operations, the Gondor Saltwater Disposal (SWD) facility, in McKenzie County, North Dakota, used a network of high-density polyethylene (HDPE) pipe that required almost 700 couplings even though the system had fewer than 1,800 feet

Salt Water Disposal Facility Takes PPI Honor for Piping Systems Division Read More »

Senegal project on track for first oil despite delay with subsea installation campaign

This post was originally published on this siteWoodside has completed more than half of the work related to its Sangomar project in Senegal, but a subsea part of the work is lagging. The post Senegal project on track for first oil despite delay with subsea installation campaign appeared first on Offshore Energy.

Senegal project on track for first oil despite delay with subsea installation campaign Read More »

Shopping Cart